Underground Utilities
We install water mains, sanitary sewer, storm sewer and power and communications conduit for subdivisions and commercial sites. Each run goes from open trench to compacted backfill, ready for the inspector.
Learn More
McMinnville is growing out past its old edges. In 2020 the city added 924 gross buildable acres to its urban growth boundary. Most of that land needs a city area plan before it can be annexed and built on. Then every lot still needs utilities in the ground and a street out front.
Turner Excavation is an excavation contractor based in Dallas, Oregon, and McMinnville is part of our service area. We work for builders, developers, business owners and farms on projects that run weeks or months. In McMinnville, that means streets and utility mains for new lots, plus grading and drainage on wet ground. Call or text (503) 507-2919 to talk through a McMinnville site.
Tell us about the project and where the site is. We look at the job and put a free estimate in writing.
The 2020 boundary change added land in six areas the city set aside for future growth. The largest single block is the Southwest Area Plan area, about 640 acres, or a square mile. The draft plan calls for new neighborhoods with mixed housing, neighborhood shops, school and park sites, and trails. It was still in draft form in fall 2026.
The Fox Ridge Road Area Plan covers about 230 acres west of Hill Road. The city adopted it in 2024, and it holds school district land set aside for a future high school. Inside the city limits, the Three Mile Lane Area Plan covers about 1,340 acres on both sides of OR 18. The city adopted that plan in 2022 for a district with several large vacant parcels.
Most of that land will need streets and utility mains before builders can start. We do subdivision and lot development from the first cut to finished, buildable lots. The work follows the engineer's approved plans, with erosion control in place before the ground opens.
The city reviews a subdivision in two stages: the tentative plan, then the final plat. The lot count decides whether the Planning Director rules or the Planning Commission holds a public hearing. The city's packet also advises developers to contact each utility that will run lines in the subdivision before they apply.
Much of McMinnville sits on valley silt loams, and several of them stay wet through winter. The NRCS soil survey for Yamhill County maps Woodburn silt loam downtown. It is moderately well drained, with a wet layer about 25 inches down from December through March.
In the Three Mile Lane area, Amity silt loam is wet about 16 inches down from December into April. Near the airport and on the northeast side, it maps Dayton silt loam. That soil is poorly drained and wet right at the surface from November through April.
On the southwest side along OR 18, Wapato silty clay loam is poorly drained and subject to occasional flooding. Soils like these set the order of work on a McMinnville site. We plan grading and earthwork around the wet layer, with structural fill and compaction where the plans call for it.
Rain sets the calendar here. NOAA's 1991 to 2020 normals put about 38 inches a year at McMinnville Municipal Airport. About nine-tenths of it falls from October through May.
McMinnville sits just upstream of where the North and South Yamhill rivers meet. Baker Creek runs along its north edge, and Cozine Creek drains a large part of town. The city's storm drainage master plan notes one effect of that layout. Backwater from the South Yamhill sets Cozine Creek's level upstream as far as Fellows Street.
Most runoff from the built-up parts of town is piped, and the plan checks that pipe against a 10-year storm. On a new subdivision or commercial site, we build storm drainage and French drains to the engineer's plan. That covers pipe, catch basins, manholes and outfalls, with curtain drains where a pad sits on wet ground.
Inside city limits, the Community Development Department runs the Building Division and the Planning Division. Public Works Engineering issues permits for work in the right-of-way, early grading and on-site development. The city's building page says Yamhill County runs electrical permits and inspections inside city limits.
For early grading, the city's application asks for Oregon DEQ's 1200-C stormwater permit on sites over one acre. Under an acre, the city takes the permit or a DEQ response stating it is not required. Outside city limits, land use and building permits run through Yamhill County Planning and Development.
Water service comes from McMinnville Water and Light, the city's municipally owned water and electric utility. Its specifications call for at least 36 inches of cover over water mains and services, measured from finished grade. In new construction, lines set deeper than the water main get backfilled and compacted first. We lay underground utilities in that order.
Communities and areas we serve around McMinnville: Downtown Third Street, Three Mile Lane, Hill Road, Fox Ridge Road, Old Sheridan Road, Lafayette Avenue, Baker Creek, Cozine Creek, Linfield University, McMinnville Municipal Airport, Joe Dancer Park, Discovery Meadows Community Park.
McMinnville ZIP codes served: 97128.
McMinnville is part of our service area. We look at the job first, then put a free estimate in writing.
(503) 507-2919
We install water mains, sanitary sewer, storm sewer and power and communications conduit for subdivisions and commercial sites. Each run goes from open trench to compacted backfill, ready for the inspector.
Learn More
We turn raw land into finished, buildable lots for builders and developers. Every underground utility goes in before the streets, and each lot is left graded for its builder.
Learn More
We clear and grade commercial sites, build the pad and run the utilities to the building. We bring the parking lot to base rock, and our paving and concrete subcontractors finish it.
Learn More
Excavator land clearing for building sites and development parcels, with the stumps and roots pulled out. We strip and stockpile the topsoil, then rough grade the ground for the next stage.
Learn More
Mass grading and cut and fill for subdivisions, commercial sites, farms and nurseries. We move the soil to the grades on the plan and compact the fill in layers.
Learn More
Trenching for water lines, power conduit and drain lines across acreage and commercial sites. Every run starts with an Oregon 811 locate request and ends in compacted backfill.
Learn More
French drains, curtain drains, catch basins and culverts for building sites, subdivisions, farms and nurseries. We build each system on a steady fall to an outlet, to the engineer's plan where there is one.
Learn More
We build subdivision streets and private roads from the subgrade up, with the utilities under them laid first. Our concrete and paving subcontractors pour the curbs and lay the asphalt, under our management.
Learn More
Long gravel driveways, farm and nursery access roads, equipment yards and construction entrances for builders and landowners. We grade the road and set the culverts, then build up the base rock to carry trucks.
Learn More
We handle foundation excavation and build compacted building pads for homes on acreage, shops, barns and commercial buildings. Footings are cut to the engineer's plan, and every pad is graded to drain.
Learn More
Directional drilling carries water services and power and communications conduit under roads, paved drives, parking lots and creeks. The pipe pulls back through the bore, and the surface above it stays in place.
Learn More
We take down old structures and break out the concrete and asphalt under them. Our dump trucks haul the debris off, and we grade the site for the next build.
Learn MoreA few of the questions we hear most around McMinnville. If yours is not here, call or text and ask.
Tell us where the land is and what the project needs, and send the plans if you have them. Call or text (503) 507-2919 or use the form, and we will set a time to look at the job.
Tell us about the project and where the site is. We look at the job and put a free estimate in writing.